Attention A T users. To access the menus on this page please perform the following steps. 1. Please switch auto forms mode to off. 2. Hit enter to expand a main menu option (Health, Benefits, etc). 3. To enter and activate the submenu links, hit the down arrow. You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.

Find a Cemetery

Connect with NCA

  • Facebook
  • Twitter
  • Blog
  • Youtube
  • Flickr
Subscribe to Receive
Email Updates

Mobile Gravesite Locator

  • image link to m.va.govOn the go?

    Try our mobile gravesite locator!

    m.va.gov

 

National Cemetery Administration

Site Elements/Features - Utility Distribution System

In addition to the Electrical and Telecommunications Service required by the cemetery, ADP requirements will include one 56 k digital circuit. The need for conduit or direct burial will be determined on a project by project basis. However, spare conduits will be installed between buildings to accommodate future, unknown needs.

Route the main distribution systems for utilities immediately adjacent to roadways within 3000 millimeters (10 feet) of the curb or pavement edge. Route any utility lines through interment areas between sections, in order to avoid obstruction of gravesites within burial sections. Install all utility lines, including electric power and communication lines, underground. Exceptions may be made depending upon excessive cost or remoteness of source from developed areas of the cemetery.